Oct 4, 2019
Concrete Barrier Replacement
Design Intent
This small project was designed to remove a deteriorating existing k-rail barrier and replace it with a new Type 60M concrete barrier.
Final Result
The project consisted of removing 280 linear feet of existing pinned krail to prepare for the construction the new concrete barrier. About 115 linear feet of the existing concrete barrier was demolished and removed. A total of 260 linear feet of new Type 60M concrete barrier was constructed. All existing roadway signs were removed on the off-ramp and upgraded with new posts and high-intensity sign panels. The project was completed by adding enhanced pavement markings and final striping. The area was revamped by adding hydro-mulch to the disturbed areas of construction.
Working Days Allocated: 30
Actual Working Days: 12
Value: $250k
Before
After
Before
After
Before
After
Project Partners
Hi-Way Safety Rentals, Inc.
Super Seal & Stripe, Inc
Hydrosprout, Inc
Cemex Ready Mix
United Rentals
Clean Sweep Services, Inc.
Rouch Rebar
CSLB #1039391 • DIR #1000063398
CSLB #1039391 • DIR #1000063398
Navigate
About
Services
Projects
Bid Schedule
Contact Us
Jobs With Us
Follow Us
Mail Address
11762 De Palma Road
Suite 1C, PMB 225
Corona, CA 92883
Phone Number
Office: (951) 674-5000
Fax: (951) 674-5020
© 2024 Genuine Engineering Inc. All Rights Reserved.
© 2024 Genuine Engineering Inc. All Rights Reserved.
Built with care by Magnified Web
Built with care by Magnified Web