May 10, 2021
Construct Sidewalks
Design Intent
This project was designed to construct new sidewalks on both sides of Chino Hills Parkway between Rustic Drive and Route 71 to meet the ADA pedestrian safe passage standards.
Final Result
Approximately 100 cubic yards of materials were excavated and removed to prepare the subgrade for the new sidewalks. A total of 1,300 linear feet of new sidewalks were constructed and new concrete placed. The existing signage was upgraded, along with adjusting all the existing utilities to the new grade. The project was completed by installing three new electrical pull boxes to monitor traffic counts.
Allocated Working Days: 20
Actual Working Days: 9
Value: $237k
Before
After
Before
After
Before
After
Project Partners
Arrow Signs, Inc.
Hi-Way Safety Rentals, Inc.
Cemex Ready Mix
United Rentals
CSLB #1039391 • DIR #1000063398
CSLB #1039391 • DIR #1000063398
Navigate
About
Services
Projects
Bid Schedule
Contact Us
Jobs With Us
Follow Us
Mail Address
11762 De Palma Road
Suite 1C, PMB 225
Corona, CA 92883
Phone Number
Office: (951) 674-5000
Fax: (951) 674-5020
© 2024 Genuine Engineering Inc. All Rights Reserved.
© 2024 Genuine Engineering Inc. All Rights Reserved.
Built with care by Magnified Web
Built with care by Magnified Web