Apr 29, 2019
Install Rock Blanket
Design Intent
This project was a simple design to upgrade the existing slopes along the westbound side of Route 10. The design intent is to change the existing vegetation to a rock blanket to minimize the maintenance and water requirements of the area.
Final Result
Over one acre of existing vegetation was removed, regraded, and compacted to prepare for the installation of the new rock blanket. Nearly 1,000 cubic yards of concrete were placed. Over 750 tons of rock cobble were set within a bed of concrete that was 10 inches in depth on a steep 1:1 slope. Nearly 47,000 square feet of rock blanket was installed. The project was finished out by trimming the existing palm trees, adding a new chain link maintenance gates, and installing permanent erosion control measures.
Working Days Allocated: 150
Actual Working Days: 103
Value: $945k
Before
After
Before
After
Before
After
Project Partners
Arrow Signs HC, Inc.
Mallard Construction, Inc.
Hydrosprout, Inc.
Allways Pumping
B.L. Hayes Trucking, Inc.
Cemex Ready Mix
Southwest Boulder & Stone
CSLB #1039391 • DIR #1000063398
CSLB #1039391 • DIR #1000063398
Navigate
About
Services
Projects
Bid Schedule
Contact Us
Jobs With Us
Follow Us
Mail Address
11762 De Palma Road
Suite 1C, PMB 225
Corona, CA 92883
Phone Number
Office: (951) 674-5000
Fax: (951) 674-5020
© 2024 Genuine Engineering Inc. All Rights Reserved.
© 2024 Genuine Engineering Inc. All Rights Reserved.
Built with care by Magnified Web
Built with care by Magnified Web