Upgrade Median by Installing Thrie Beam Barrier
Design Intent
Install a metal Thrie-Beam barrier to prevent vehicles from crossing over the median into opposing traffic.
Final Result
The entire construction area was cleared of vegetation. An existing concrete barrier, Type 60M, was reconstructed and extended to accommodate the new metal Thrie-Beam barrier. Approximately, 1700 linear feet of new Thrie-Beam Barrier was installed, along with a new Smart Crash Cushion, Type SGI 100GM to enhance safety. To complete the project, the existing drainage inlet was raised to the new elevations, imported soil was placed to ensure proper drainage and erosion control measures were added to the disturbed areas.
Total Working Days Allocated: 45
Actual Working Days: 14
Value: $439k
Before
After
Before
After
Before
After
Project Partners
Alcorn Fence Company
Diversified Landscape Company
Rupert Construction Supply
Hi-Way Safety Rentals, Inc.
Hydraulic Crane Rental, LLC.
Robertson’s Ready Mix
CSLB #1039391 • DIR #1000063398
CSLB #1039391 • DIR #1000063398
Navigate
About
Services
Projects
Bid Schedule
Contact Us
Jobs With Us
Follow Us
Mail Address
11762 De Palma Road
Suite 1C, PMB 225
Corona, CA 92883
Phone Number
Office: (951) 674-5000
Fax: (951) 674-5020
© 2024 Genuine Engineering Inc. All Rights Reserved.
© 2024 Genuine Engineering Inc. All Rights Reserved.
Built with care by Magnified Web
Built with care by Magnified Web